Friday, 25 March 2011

25th march



today i have done all the stairwells to the rooftop and also changed some of my schedule and certain assets that wern't in my final plan and i will need to edit them at a later date, also i have textured the small wall around the edges of the rooftop so players wont fall straight off. i have to fix the bot paths as they wont go over the balloons. and finally i have put a billboard in the top hand corner of the map with scaffolding and a plank bridge for cover and thigh jump pad. next week i need to make for definate air conditioning and also model a elevator after that i need to place ammo drops and weapons.




No comments:

Post a Comment